Education & explainersYouCanDo TVJust 400 Feet of Buried Cable Took Over 2 Years. Why America Still Has Millions of Power Poles

Just 400 Feet of Buried Cable Took Over 2 Years. Why America Still Has Millions of Power Poles

15.1× channel medianLong-form23:24Science & TechnologyPublished Oct 12, 2026, 4:04 PM · 1w ago
Views
55,781
+59 views/hour
Views / hour now
59
measured 2h ago
Peak views / hour
230
1d ago
First 24 hours
—
not tracked from upload
Engagement
0.9%
likes + comments / views
Likes
460
0.8% of views
Comments
16
0.03% of views
Est. ad revenue
$268–$669
lifetime, $4.8–12 RPM

Checked every 12 h while the video is this age · last check 2h ago · next in 584 min. YouTube itself updates public counts with a short delay.

Avg views / day
7K
since upload
vs channel median
15.1×
this video's views ÷ the channel's usual
Rank in channel
#2
of 22 tracked

Views over time

7 readings

Total views Views gained per hour

Description

Why does America still have millions of power poles when underground power lines can cut wildfire ignitions by about 99%? Explore the extreme engineering behind the power grid, from helicopter-installed transmission towers and high-voltage wire stringing to giant trenchers, horizontal directional drilling, concrete duct banks, and underground vaults. Watch crews handle cable reels weighing over 100 tons, pull power cables under highways and across waterways, and build the substations that connect everything. Discover why just 400 feet of underground cable took over two years, how a major project crosses 200 obstacles, and why repairs, cost, complex ground conditions, and wildfire risk determine which power lines America buries—and which remain overhead. Which approach would you choose? Timeline: 0:30 — Why America Still Has Millions of Poles 2:08 — Building High Voltage Lines Over Difficult Terrain 4:25 — Stringing and Tensioning Massive Overhead Power Lines 7:31 — Giant Trenchers Carve Routes for Buried Cables 10:52 — Drilling Beneath Highways Without Closing the Road 13:15 — Moving Hundred Ton Reels of Underground Cable 16:11 — Crossing Bridges and Bringing Offshore Cables Ashore 17:48 — Building Substations for High Voltage Power Delivery 20:22 — Crossing Hundreds of Obstacles Beneath the Ground 22:28 — Why America Does Not Bury Every Line Hashtags: #UndergroundPowerLines #PowerGrid #ElectricalEngineering #PowerLineConstruction #ExtremeEngineering #HeavyMachinery #HighVoltage #CivilEngineering #EngineeringDocumentary #Infrastructure --------------------------------- ⚠️ Copyright Disclaimers • We use images and content by the YouTube Fair Use copyright guidelines • Section 107 of the U.S. Copyright Act states: “Notwithstanding the provisions of sections 106 and 106A, the fair use of a copyrighted work, including such use by reproduction in copies or phonorecords or by any other means specified by that section, for purposes such as criticism, comment, news reporting, teaching (including multiple copies for classroom use), scholarship, or research, is not an infringement of copyright.” • This video could contain certain copyrighted video clips, pictures, or photographs that were not specifically authorized to be used by the copyright holder(s), but which we believe in good faith are protected by federal law and the fair use doctrine for one or more of the reasons noted above.

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.