History & cultureThomas Relives HistoryThe Worst Job in America: Building the Hoover Dam (1931–1936)

The Worst Job in America: Building the Hoover Dam (1931–1936)

Long-form18:22

Published Sep 28, 2026, 8:15 PM · 2w ago

Thomas Relives History
Thomas Relives History
33.4K subscribers · median 11.9K views
Views
6,325
+1 views/hour
Likes
88
1.4% of views
Comments
13
0.21% of views

Checked every 12 h while the video is this age · last check 13h ago · next in 0 min. YouTube itself updates public counts with a short delay.

Open on YouTube
Views / hour now
1
measured 13h ago
Peak views / hour
1
2d ago
Avg views / day
333
since upload
First 24 hours
—
not tracked from upload
vs channel median
0.5×
Rank in channel
#18
of 22 tracked
Engagement
1.6%
likes + comments / views
Est. ad revenue
$25–$57
lifetime, $4–9 RPM

Views over time

5 readings · line: total views · bars: views gained per hour

Description

Discover how Hoover Dam was built during the Great Depression—and how thousands of workers transformed an inaccessible canyon into one of the greatest engineering projects in American history. In this AI-powered historical reconstruction, we rebuild Hoover Dam from the first construction camps in 1931 to its completion years ahead of schedule, using historical engineering records, construction reports, project documentation, photographs, and contemporary accounts to recreate the machines, workers, tunnels, concrete pours, and extraordinary logistics behind the project. Before the dam itself could rise, crews had to build the infrastructure required to build it. Roads, power, water supplies, Boulder City, construction facilities, and access into Black Canyon all had to be created while the Colorado River continued flowing directly through the future construction site. Then came one of the project's greatest challenges: diverting an entire river through four tunnels, each 56 feet in diameter and roughly 4,000 feet long, blasted through solid rock on both sides of the canyon. Follow the tunnel crews working around the clock with enormous multi-level drilling jumbos, explosives, trucks, and pneumatic equipment—and see the dangerous conditions created by heat, dust, blasting, and carbon monoxide from gasoline-powered equipment underground. Then watch the dam itself begin to rise. Engineers could not simply pour more than three million cubic yards of concrete into one enormous structure: the heat generated while curing could have caused catastrophic cracking. Instead, Hoover Dam was divided into 230 interlocking concrete columns poured in shallow lifts. An extraordinary 582 miles of steel cooling pipe were embedded throughout the concrete while refrigerated water circulated through the structure, allowing engineers to remove heat from the dam from the inside. See enormous cableways carry 20-ton buckets of wet concrete across Black Canyon, workers ride those buckets t
Tags
Hoover DamHoover Dam HistoryBuilding Hoover DamHow Hoover Dam Was BuiltHoover Dam ConstructionBoulder DamBoulder Dam HistoryBlack CanyonColorado RiverHoover Dam WorkersHoover Dam TunnelsHoover Dam EngineeringGreat DepressionAmerican HistoryAmerican Engineering

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.