Science & spaceFactory Forge PrimeShredding a 770,000 lb Wind Turbine to Build Mega-Excavator Tracks! #SteelRecycling

Shredding a 770,000 lb Wind Turbine to Build Mega-Excavator Tracks! #SteelRecycling

Long-form14:57Science & TechnologyPublished Aug 31, 2026, 7:23 PM · 7w ago
Views
773
+0 views/hour
Views / hour now
0
measured 2h ago
Peak views / hour
—
 
First 24 hours
—
not tracked from upload
Engagement
0.0%
likes + comments / views
Likes
0
0.0% of views
Comments
0
0.00% of views
Est. ad revenue
—
channel not monetized

Checked every 24 h while the video is this age · last check 2h ago · next in 1270 min. YouTube itself updates public counts with a short delay.

Avg views / day
15
since upload
vs channel median
1.9×
this video's views ÷ the channel's usual
Rank in channel
#5
of 20 tracked

Views over time

0 readings

Total views Views gained per hour
Live tracking started
The chart fills in as FameX records new readings.

Description

Shredding a 770,000 lb Wind Turbine to Build Mega-Excavator Tracks! How Scrap Wind Turbines Are Melted & Cast Into Giant Steel Tracks. Inside the 3000°F Factory Turning Wind Turbines into Indestructible Tracks. The Extreme Engineering Behind Mega-Mining Excavator Tracks (Full Process). What Happens to Dead Wind Turbines? (Massive Steel Recycling Process) Inside a massive 60,000-square-meter US-grade heavy forge, watch the full 3000°F process of recycling a decommissioned offshore wind turbine into indestructible mega-mining excavator tracks. From tearing apart 770,000 lbs of marine-grade structural steel to the blinding electric arc furnaces and high-pressure sand casting, we document the extreme engineering required to build heavy earth-moving infrastructure. See the colossal shredders, magnetic sorters, and giant 50-ton refractory crucibles in action. ⏳ The Full Transformation Process: - Delivering the 350-Ton Wind Turbine Tower - Extreme Demolition: Plasma Cutters & 500-Ton Cranes - The Mega-Shredder: Crushing Marine-Grade Steel - Magnetic Sorting & Contaminant Removal - Ignition: Inside the 3000°F Electric Arc Furnace - Prepping the Giant Sand Molds & Ceramic Cores - The Pour: 50 Tons of Liquid Steel - Breakout: Shattering the Molds - CNC Machining & Final Track Assembly - Quality Control & Mega-Mining Shipment ⚙️ Tech Specs: Material: High-Strength Structural Steel (Marine-Grade) Furnace Peak Temp: 1,600°C (2,912°F) Final Product: Continuous Excavator Track Chain Disclaimer: This video documents professional industrial manufacturing processes. All operations shown are conducted by trained professionals in controlled, secure facilities wearing appropriate PPE. Do not attempt to replicate any industrial cutting or forging techniques. #IndustrialEngineering #HowItsMade #MetalCasting #HeavyMachinery #SteelRecycling #MegaMachines
Tags
factory forge primemega factorymega factory toursatisfying manufacturing processinside the factoryheavy machineryhow it's mademass production processindustrial production linebizarre factory processsatisfying factory machinesunbelievable manufacturingextreme factory machinesautomated factory robotsincredible factory technologyfactory assembly linegiant machinerysatisfying industrial processUSA manufacturingraw material processing

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.