Science & spaceNextGen ManufacturingHow Egypt is Building the Impossible 310 KM River that Turns the Sahara Desert Green

How Egypt is Building the Impossible 310 KM River that Turns the Sahara Desert Green

Long-form16:149.0× channel median

Published Aug 11, 2026, 1:00 PM · 2mo ago

NextGen Manufacturing
NextGen Manufacturing
170K subscribers · median 168K views
Views
1,515,488
+103 views/hour
Likes
8.2K
0.5% of views
Comments
513
0.03% of views

Checked every 24 h while the video is this age · last check 21h ago · next in 160 min. YouTube itself updates public counts with a short delay.

Open on YouTube
Views / hour now
103
measured 21h ago
Peak views / hour
103
21h ago
Avg views / day
23K
since upload
First 24 hours
—
not tracked from upload
vs channel median
9.0×
Rank in channel
#4
of 20 tracked
Engagement
0.6%
likes + comments / views
Est. ad revenue
$6,062–$15,155
lifetime, $4–10 RPM

Views over time

0 readings · line: total views · bars: views gained per hour

Live tracking started
The chart fills in as FameX records new readings.

Description

More than 100 million Egyptians live on just 4% of their country. Now Egypt is building a 310-kilometre “second Nile” through the Sahara. Known as the Toshka Project or New Valley Project, this unfinished megaproject is designed to carry Nile water from Lake Nasser deep into Egypt’s Western Desert, transforming barren land into farms and new communities. At its center is a colossal pumping station containing 24 vertical pumps. The system can move approximately 1.2 million cubic metres of water per hour, lifting it nearly 50 metres before releasing it into an enormous concrete-lined canal network. This engineering documentary reconstructs the extraordinary construction process—including approximately 80 million cubic metres of canal excavation, concrete lining placed in 50-degree Sahara heat, 320 kilometres of buried irrigation pipeline and massive center-pivot machines designed to cultivate the desert. But the project is not finished. Approximately 250 kilometres of the planned 310-kilometre route have been constructed, while another 60 kilometres must still cross some of the Sahara’s most difficult terrain. Completed sections are already supplying enormous irrigated farms producing wheat, cotton, sugar beet and dates in places that were previously empty desert. Inside this documentary: • Why Egypt decided to create a second Nile Valley • How engineers built a massive pumping station beside Lake Nasser • How extreme heat forced construction crews to work at night • How workers excavated and lined hundreds of kilometres of desert canal • How buried pipelines distribute water across the Sahara • How engineers fought sandstorms, salt and rising groundwater • How center-pivot irrigation transformed sand into farmland • Why the final 60 kilometres remain unfinished CHAPTERS 00:00 Egypt’s impossible second Nile 01:04 Why Egypt needs more farmland 01:27 Lake Nasser and the 310 km plan 02:10 Building the massive pumping station 04:19 Excavating through the Sahara 0
Tags
egypt toshka projectegypt second nilemegaprojectshow its madefactory tourengineeringdesert canal constructionconstructionsheikh zayed canalsahara desertdesert irrigationfuture technologyegypt megaprojectengineering documentarydesert construction

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.