Science & spaceGrand StructuresWhy Israel Needed an 1,800-Ton Monster to Cut Through Jerusalem’s Mountains | Grand Structures

Why Israel Needed an 1,800-Ton Monster to Cut Through Jerusalem’s Mountains | Grand Structures

Long-form8:27Science & Technology5.4× channel median

Published Oct 7, 2026, 9:01 PM · 1w ago

Grand Structures
Grand Structures
34.7K subscribers · median 993 views
Views
5,346
+28 views/hour
Likes
90
1.7% of views
Comments
2
0.04% of views

Checked every 12 h while the video is this age · last check 5h ago · next in 395 min. YouTube itself updates public counts with a short delay.

Open on YouTube
Views / hour now
28
measured 5h ago
Peak views / hour
45
1d ago
Avg views / day
618
since upload
First 24 hours
—
not tracked from upload
vs channel median
5.4×
Rank in channel
#4
of 21 tracked
Engagement
1.7%
likes + comments / views
Est. ad revenue
$21–$53
lifetime, $4–10 RPM

Views over time

2 readings · line: total views · bars: views gained per hour

Description

To connect Tel Aviv and Jerusalem in just 28 minutes, engineers couldn't simply lay tracks over the hills. High-speed trains are strictly limited to a 2.5% grade, meaning the only way forward was straight through the solid rock. In this documentary, we break down the extreme civil engineering of Israel's 7.4-mile twin-bore rail tunnel. Discover how 1,800-ton Tunnel Boring Machines (TBMs) chewed through uniform rock continuously, why the crews were forced to abandon the machines and switch to dangerous drill-and-blast methods as the rock grew harder near Jerusalem, and why digging two parallel tunnels is vastly safer than building one massive cavern. Subscribe to Grand Structures for deep dives into extreme civil engineering, architectural physics, and hidden megaprojects #GrandStructures #CivilEngineering #MegaProjects #TunnelBoringMachine #Israel #Infrastructure #Engineering #Railway Chapters 0:00 — The Mid-Mountain Switch 0:45 — The 2.5% Grade Problem 2:20 — The 1,800-Ton Tunnel Boring Machine 4:10 — Drill & Blast: When the Mountain Fights Back 5:50 — Why Build Two Tunnels Instead of One? 7:00 — The Scale of Concrete and Steel 7:50 — The Right Tool for the Mountain & Next Time
Tags
mega projectsengineering marvelstunnel boring machineTBMTel Aviv Jerusalem railwaydrill and blast tunnelingcivil engineeringinfrastructure megaprojectstwin bore tunnelIsrael railwayunderground constructionrail engineeringGrand StructuresJerusalemTel AvivIsraelengineeringWhy Israel Needed an 1800-Ton Monster to Cut Through Jerusalem’s MountainsRailwaytrainmetro

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.