How Hong Kong Built an Underwater Train Tunnel that Defies the Ocean

Long-form14:12

Published Jul 28, 2026, 1:00 PM · 2mo ago

NextGen Manufacturing
NextGen Manufacturing
170K subscribers · median 168K views
Views
62,339
+3 views/hour
Likes
296
0.5% of views
Comments
25
0.04% of views

Checked every 24 h while the video is this age · last check 22h ago · next in 116 min. YouTube itself updates public counts with a short delay.

Open on YouTube
Views / hour now
3
measured 22h ago
Peak views / hour
3
1d ago
Avg views / day
781
since upload
First 24 hours
—
not tracked from upload
vs channel median
0.4×
Rank in channel
#16
of 20 tracked
Engagement
0.5%
likes + comments / views
Est. ad revenue
$249–$623
lifetime, $4–10 RPM

Views over time

0 readings · line: total views · bars: views gained per hour

Live tracking started
The chart fills in as FameX records new readings.

Description

Hong Kong East Rail Line construction: how engineers built a train tunnel under a live shipping lane, 30 metres below Victoria Harbour, for HK$90 billion. Right now a cargo ship crosses Victoria Harbour above a speeding East Rail train. Both in the same harbour. Simultaneously. That tunnel — 11 concrete boxes, each 23,000 tonnes, built at Shek O Quarry, floated out, and sunk one by one to the harbour floor at night — took 10 months, a rebuilt gravel bed after a cargo anchor dragged through it, and a Marine Police lane closure for every single element. This documentary covers the full engineering and construction process: harbour immersion, 7 TBMs, 700 defective rebar bars found buried in load-bearing walls, the Island Line underpinned live 22mm past its 20mm limit, and the Category 10 simulation that puts joint 3 at 96% of design capacity. What's in this video: How engineers built 11 tunnel elements on land, floated them out, and sunk them 30 metres to the harbour floor How a 23,000-tonne element was held at 15 metres depth for 4 days while engineers rebuilt the gravel bed below it How a 23,000-tonne element was held at 15 metres depth for 4 days while engineers rebuilt the gravel bed below it How 7 TBMs were built through marine clay, granite, and 400 uncharted building piles simultaneously How 700 defective bars were found buried in load-bearing station walls — and how a steel frame was built to bypass them Subscribe to NEXTGEN MANUFACTURING to understand the incredible machines, blueprints, and megaprojects that built our world. #EastRailLine #Megaprojects #HowItsMade #HongKong #FactoryTour #Engineering #UnderwaterTunnel #Construction #InsideTheFactory #StormSurge #Tunnel #FullProcess #Aviation #Trending ⚠️ IMPORTANT: ABOUT THIS VIDEO ------------------------------------------------------------------- This is an educational documentary analyzing the engineering and construction of public infrastructure, based entirely on open-source information. All visuals
Tags
east rail linehong kong mtr east rail linemegaprojectshow its madefactory tourengineeringimmersed tube tunnel constructionconstructionshatin central linkunderwater tunnelmtr hong kongtunnel engineeringtunnel constructionimmersed tube tunnelfuture technology

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.