Education & explainersDT Civil CoreNepal Built a 111 MW Power Plant Inside the Himalayas — Then the Flood Came
Nepal Built a 111 MW Power Plant Inside the Himalayas — Then the Flood Came
Long-form18:492.6× channel median
Published Sep 16, 2026, 11:00 AM · 4w ago
DT Civil Core
3.9K subscribers · median 1.4K views
AI imagery · confirmed$Likely
Views
3,703
+0 views/hour
Likes
12
0.3% of views
Comments
7
0.19% of views
Checked every 12 h while the video is this age · last check 7h ago · next in 253 min. YouTube itself updates public counts with a short delay.
Views / hour now
0
measured 7h ago
Peak views / hour
—
Avg views / day
129
since upload
First 24 hours
—
not tracked from upload
vs channel median
2.6×
Rank in channel
#4
of 20 tracked
Engagement
0.5%
likes + comments / views
Est. ad revenue
$15–$37
lifetime, $4–10 RPM
Views over time
2 readings · line: total views · bars: views gained per hour
Description
Deep inside the Himalayas, engineers spent more than a decade building Nepal’s 111 MW Rasuwagadhi Hydroelectric Project.
This was not a giant storage dam.
Rasuwagadhi is a run-of-river hydropower system designed to divert part of a Himalayan river through more than four kilometers of underground waterway, use roughly 168 meters of gross head to drive three vertical-axis Francis turbine-generator units, and return the water downstream through a tailrace.
Its powerhouse was built underground.
Its headrace tunnel stretches about 4,185 meters through the mountain.
Its hydraulic system was designed around a discharge of 80 cubic meters per second.
Commercial operation finally began on December 31, 2024.
Then, just over six months later, disaster arrived from upstream.
On July 8, 2025, a glacial flood traced by Nepal’s disaster-management authorities to the rapid discharge of a supraglacial lake associated with the Purepu Glacier in Tibet moved into the river system leading toward Nepal.
At Rasuwagadhi, the flood damaged headworks and hydromechanical systems, inundated parts of the underground powerhouse, filled the tailrace tunnel with debris and logs, damaged access infrastructure, and forced generation to stop.
But this was not a giant dam collapse.
The underground powerhouse cavern did not simply cave in.
The deeper engineering problem was that even a power station protected by a mountain still has to remain connected to the river outside.
In this documentary, we follow the full engineering process:
the Himalayan terrain,
the run-of-river concept,
the 4.185 km headrace tunnel,
difficult underground geology,
the powerhouse cavern,
Francis turbine installation,
hydraulic head and pressure,
tailrace and transmission systems,
more than a decade of construction,
and the July 2025 flood that exposed the vulnerability of the plant’s river interfaces.
The central question is simple:
How can engineers put a power station inside a mountain — and still remain vulnerable to the r
Tags
Rasuwagadhi Hydroelectric ProjectRasuwagadhi hydropowerNepal hydropowerNepal hydroelectric power plantHimalayan hydropower111 MW hydropowerhydropower tunnelHimalayan engineeringcivil engineering documentarymega constructionimpossible engineeringhydropower constructionglacial flood NepalJuly 2025 Nepal floodsupraglacial lake flood
Details
- Published
- Sep 16, 2026, 11:00 AM
- Length
- 18:49 (1,129 s)
- Format
- Long-form
- Category
- —
- Audio language
- —
- Quality
- —
- Captions
- —
- Made for kids
- —
- Licensed content
- —
- Video ID
- _azDumHA_4g
More from DT Civil Core
What Really Triggered the Nepal–Tibet Mountain Collapse? New Evidence Explained637 views · 2w ago · +1/h
Why Engineers Build Hydropower Plants Inside Himalayan Mountains (Full Process)1.4K views · 2w ago
Why Himalayan Bridges Fail Even When the Bridge Is Strong?1.9K views · 2w ago
How Nepal Rebuilds Himalayan Highways After the Mountains Destroy Them2.2K views · 3w ago
How the UAE Is Building a Second Oil Pipeline to Bypass the Strait of Hormuz1.2K views · 3w ago
Road or Tunnel How Engineers Choose Routes Through Nepal’s Himalayas1.5K views · 3w ago
Why Nepal Keeps Building Roads Through the Himalayas — Even When the Mountains Keep Destroying Them2.1K views · 3w ago
Nepal Built a Highway Through the Himalayas — Then the River Took the Road Back7.7K views · 3w ago
Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.