History & cultureFacts Compass How Engineers Built the Atal Tunnel Under the Himalayas | India’s Engineering Marvel

How Engineers Built the Atal Tunnel Under the Himalayas | India’s Engineering Marvel

Short1:01People & BlogsPublished Sep 21, 2026, 1:00 PM · 4w ago
Views
379,922
+16 views/hour
Views / hour now
16
measured 15h ago
Peak views / hour
18
3d ago
First 24 hours
—
not tracked from upload
Engagement
—
likes + comments / views
Likes
—
hidden
Comments
10
0.00% of views
Est. ad revenue
$3–$9
lifetime, $0.009–0.024 RPM

Checked every 24 h while the video is this age · last check 15h ago · next in 500 min. YouTube itself updates public counts with a short delay.

Avg views / day
12.1K
since upload
vs channel median
1.7×
this video's views ÷ the channel's usual
Rank in channel
#7
of 22 tracked

Views over time

4 readings

Total views Views gained per hour

Description

Atal Tunnel | Rohtang Tunnel | Himalayan Tunnel Engineering | Tunnel Construction India | Pir Panjal Tunnel | Indian Engineering Before the Atal Tunnel was built, Rohtang Pass remained closed for around six months every year because of heavy snowfall, cutting off Manali’s connection with Lahaul-Spiti. To solve this problem, engineers built a 9.02 km tunnel beneath the Pir Panjal Himalayas, creating an all-weather route through one of India’s most challenging terrains. Construction used the NATM method and drill-and-blast technique, with excavation beginning simultaneously from the Manali and Sissu sides. But the real challenge came at the Seri Nala fault zone, where the rock was severely broken and around 8,000 litres of water started entering the tunnel every minute. Crossing this 587 metre section alone took more than four years. Engineers used thick layers of shotcrete and support systems, drilled deep holes to drain the water, and strengthened the rock using rock bolts and grouting. The tunnel was built with a horseshoe-shaped design and included a separate emergency escape tunnel for safety. After years of difficult construction, the 9.02 km Atal Tunnel was completed in 2020, transforming year-round connectivity between Manali and Lahaul-Spiti. This is the engineering story behind how India built a road straight through the Himalayas. #AtalTunnel #RohtangTunnel #IndianEngineering #HimalayanEngineering #TunnelConstruction #PirPanjal #EngineeringIndia #InfrastructureIndia #MegaProjectsIndia
Tags
Atal TunnelRohtang TunnelAtal Tunnel constructionHimalayan tunnelPir Panjal Tunneltunnel engineering IndiaIndian infrastructuremega projects Indiamountain engineeringtunnel constructionRohtang PassManali Lahaul SpitiNATM tunneldrill and blastIndian engineering projectsengineering marvel Indiaimpossible engineeringinfrastructure documentary

Statistics from the YouTube Data API, tracked by FameX. Views per hour, revenue and comparisons are FameX estimates.